Reference number : 002
Project includes:
1 Remove the floor fabric
2 Pave floor tiles and skirting lines on the floor
3 Renovate the door leaf, door frame, sealing line and paint by hand
4 Replace the door leaf, door frame, sealing line and paint by hand
5 Wall and ceiling shovel paint base, paint moisture-proof oil
6 Criticize the walls and ceilings with plaster, latex paint or wallpaper
HKD $380000
*Remark: